Deploy & Run

The Deploy & Run module is for sending transactions to the current Environment.

The three main actions of the Deploy & Run module are:

  1. Deploying a contract

  2. Loading a deployed contract

  3. Interacting with the functions of a deployed contract

This documentation page will cover Deploying and Loading. Interacting will be covered in Deploy & Run part 2.

Deploy & Run plugin

Deploying a contract

To deploy a contract, it must first be compiled. There are three ways you can compile a contract:

  1. You can compile your contract directly from the Solidity Compiler plugin. This allows you to configure the compiler’s behavior, including the Solidity version, optimization settings, and EVM target before compiling.

  2. You can use the “Compile” button that appears in the main panel when you have an active Solidity file. The compilation uses the configuration from the Solidity Compiler plugin, applying whatever settings were last saved there.

  3. You can compile directly from the Deploy & Run plugin using the “Deploy” section. It displays a list of the contracts active in the editor, along with a “Compile” button that compiles using the settings stored in the Solidity Compiler plugin.

The Deploy tab showing the contract selector and Compile button.

Once you have compiled and selected your contract, choose the chain for deployment and/or method for deployment, deployment wallet, and EVM version in the ENVIRONMENT section.

The Environment tab showing environment selector, account, gas limit, and value fields.

참고

If you want to connect Remix with a browser wallet (e.g., MetaMask, Phantom), set your environment to Browser Extension and choose your preferred wallet/chain.

Before clicking Deploy, you can configure two additional fields:

  • Gas Limit: Sets the maximum amount of gas allowed for the deployment transaction. Remix pre-fills a sensible default, but you can increase it if your contract is complex or if the deployment reverts due to an out-of-gas error.

  • Value: The amount of ETH (or wei, gwei, etc.) sent along with the deployment transaction. Only relevant if your contract has a payable constructor. Otherwise, leave it at 0.

Clicking “Deploy” sends a transaction that deploys the selected contract. When the transaction is mined, the newly created instance will be added (this might take several seconds) to the “Deployed Contracts” section.

참고

If the contract’s constructor function has parameters, you will need to specify them.

Verifying on deployment

When connected to a public network, there is a switch to enable contract verification.

The contract verification switch.

The contract’s source-code and metadata will be submitted to Etherscan, Sourcify, Blockscout, and Routescan. For the verification to go through on Etherscan, their API needs to be input either in the Remix Settings panel or in the Contract Verification plugin’s Settings tab. Verification can also be done using the Contract Verification plugin.

Loading deployed contracts

If a contract has already been deployed, you can load it into Remix using the “Add Contract” button on the Deployed Contracts section. Adding an already deployed contract costs no gas, since no redeployment is required. To load a deployed contract:

  1. Make sure the contract’s source code or ABI is in the active tab of the Editor. If using source code, it must be compiled with the same settings as the originally deployed contract.

  2. Enter the deployed contract’s address in the contract address field that appears when you click the “Add Contract” button.

  3. The contract instance will appear in the Deployed Contracts list, ready to interact with.

The Deployed Contracts section showing the contract address field and Add button.

경고

Only load contracts from addresses you trust.

Using the ABI to load contracts

If you don’t have the source code but have the contract’s ABI, you can still load and interact with it.

The ABI is a JSON array that describes a contract’s functions, inputs, and outputs. To use it:

  1. Create a new file in Remix with a .abi extension and paste the ABI content into it.

  2. Make sure this file is the active tab in the Editor.

  3. Enter the contract address in the Contract address field and click the “Add” button. The contract will appear in the Deployed Contracts list.

참고

To get the ABI of a contract you’ve compiled, open the Solidity Compiler plugin, compile the contract, then click Compilation Details. The ABI is listed in the modal that appears.

Supported environments

The Deploy & Run plugin supports several environments that determine where your transactions are sent and how they are signed. You can choose between an in-browser sandbox (including forked chains), a browser wallet, a mobile wallet, or a locally running node.

Remix VM

The Remix VM is a sandbox blockchain in the browser. Transactions do not require an approval to run. Remix VM comes with 10 accounts, each loaded with 100 ETH.

The Remix VM supports multiple EVM forks letting you simulate different network conditions without connecting to a live chain.

The state of the Remix VM chain is saved in the .states folder in the File Explorer. If you do not want the Remix VM state to be saved, uncheck Save environment state in the Settings panel.

Saving the state means you can refresh the browser and not lose your work, the caveat being that browser storage is inherently unstable. Pushing to a remote repository avoids relying on browser storage entirely.

In collaborative workflows, you can share the VM state by having teammates load the state.json file into their Remix instance.

The File Explorer showing the .states folder containing the state.json file.

Browser Extension

Browser extension wallets allow you to connect Remix to a wallet installed in your browser, such as MetaMask or Phantom. This is the standard way to deploy contracts to a live network or testnet using your own accounts.

To use a browser extension:

  1. Install a supported wallet extension e.g., MetaMask. (This option will not be visible if you do not have an extension installed).

  2. Set the ENVIRONMENT to Browser Extension in the Deploy & Run panel.

Transactions sent through a browser extension require approval in the wallet popup before they are broadcast to the network.

참고

Make sure your wallet is unlocked and set to the correct network before deploying.

Mobile Wallets (Wallet Connect)

WalletConnect allows you to connect Remix to a wallet on your mobile device by scanning a QR code. This is useful when you want to sign transactions with a hardware-backed or mobile wallet rather than a browser extension.

To use WalletConnect:

  1. Set the ENVIRONMENT to WalletConnect.

  2. A QR code will appear, scan it with your mobile wallet app (e.g., MetaMask Mobile, Rainbow, Trust Wallet).

  3. Approve the connection in your wallet. Remix will then use your mobile wallet’s accounts and selected network.

Transactions triggered in Remix will appear as signing requests on your mobile device.

Development Environments

Development environments connect Remix to locally running nodes or L2 networks, making them suitable for advanced testing and integration workflows.

  • Hardhat Provider: Connects to a locally running Hardhat node. Transactions execute instantly and do not require wallet approval, making it fast for iterative development.

  • Foundry Provider: Connects to a locally running Anvil node (part of the Foundry toolchain). Like Hardhat, it runs a local chain with pre-funded accounts and instant transaction finality.

  • External HTTP Provider: Connects Remix to any remote or local Ethereum-compatible node via an RPC URL (e.g., a Geth or Erigon instance). Enter the node’s http endpoint when prompted. Read more about connecting to an External Provider.

참고

When using a local provider (Hardhat or Foundry), make sure the node is running before selecting the environment in Remix.

More About External HTTP Provider

If you are using Geth and https://remix.ethereum.org, please use the following Geth command to allow requests from Remix:

geth --http --http.corsdomain https://remix.ethereum.org

Also see Geth Docs about the http server

To run Remix using https://remix.ethereum.org and a local test node, use this Geth command:

geth --http --http.corsdomain="https://remix.ethereum.org" --http.api web3,eth,debug,personal,net --vmdebug --datadir <path/to/local/folder/for/test/chain> --dev console

If you are using Remix-alpha or a local version of Remix, replace the URL of the –http.corsdomain with the URL of Remix that you are using.

To run Remix Desktop and a local test node, use this Geth command:

geth --http --http.corsdomain="package://a7df6d3c223593f3550b35e90d7b0b1f.mod" --http.api web3,eth,debug,personal,net --vmdebug --datadir <path/to/local/folder/for/test/chain> --dev console

Also see Geth Docs on Dev mode

The Web3 Provider Endpoint for a local node is http://localhost:8545

경고

Avoid using a wildcard with the Geth flag --http.corsdomain. Using --http.corsdomain * allows any origin to access your node. Only use this when running a test chain with test accounts. For real accounts or mainnet, always specify the exact URL, e.g. --http.corsdomain 'https://remix.ethereum.org'.

Forking Chains in Remix

Forking a chain will bring that chain to the Remix VM. Once it is forked, you’ll have access to the 10 accounts loaded with 100 ETH.

Remix VM Forks

You can also fork the Remix VM in its current state. To fork the Remix VM, click the version control icon to the right of the Environment title to create a fork and then to name it.

Fork VM state modal.

You can switch between existing Remix VM forks by selecting “Forked State” from the Environment dropdown menu.

Forked state option.

참고

The “Forked State” option only appears in the dropdown when there is an existing Remix VM fork.

Live Network Forks

The Remix VM can fork a live network, loading its state into the in-browser sandbox. This lets you test contracts against real on-chain data (such as existing token balances, deployed protocols, or mainnet contract state) without spending real ETH.

The following fork options are available:

  • Mainnet fork: Forks the Ethereum mainnet at the latest block.

  • Sepolia fork: Forks the Sepolia testnet, useful for testing against testnet deployments.

  • Custom fork: Forks any EVM-compatible chain at a block number of your choice. See Custom Fork below.

Forking a Custom Chain

The Custom fork option allows you to specify a chain’s RPC server, a block number, and an EVM version.

The Custom Fork modal showing fields for Node URL, block number, and EVM version.

You can get the Node URL from chainlist.org. If the chain does not load, you may need to choose a different RPC server. You will also need to choose an EVM version appropriate to the block number. If you choose a very low block number, post-Merge EVM versions won’t work since they didn’t exist at that point in the chain’s history.

You can reset the state of the VM by clicking the refresh icon to the right of the version control icon. Forking the VM lets you snapshot a working state, try changes, and return to the original if needed.

Using the recorder

The Recorder is a tool used to save a sequence of transactions in a JSON file and re-run them later, either in the same environment or in another.

Saving to the JSON file (by default it’s called scenario.json) allows one to easily check the transaction list, tweak input parameters, change linked libraries, etc.

There are many use cases for the Recorder.

For instance:

  • After having coded and tested contracts in a constrained environment, like the Remix VM, you could then switch the environment and redeploy the contract to a more realistic environment, like a public testnet or to a Geth node. By using the generated scenario.json file, you will be using all the same settings that you used in the Remix VM. The Recorder eliminates the need to manually recreate that state step by step.

    You can also change the settings in the scenario.json file to customize the playback.

  • Deploying a contract often requires more than creating one transaction, and the Recorder will automate this deployment.

  • Working in a dev environment often requires setting up the state initially.

The Recorder panel showing the transactions recorded count and save button.

When checked, the option Run transactions using the last compilation result allows you to develop a contract and easily set the state using the latest compiled versions of the contracts.

scenario.json

To create this file in the Recorder, you first need to have run some transactions. The Transactions Recorded counter starts at 0 and increments with each transaction. Once you have recorded the transactions you need, click the floppy disk icon to save the scenario.json file.

The example below shows a scenario.json file containing three transactions, all sent from account{0}:

  1. Deploy testLib: deploys a library contract with no constructor parameters.

  2. Deploy test: deploys a contract with constructor parameter 11. It depends on testLib, so the linkReferences property maps the library name to the address of the previously created instance using the timestamp ID created{1512830014773}.

  3. Call set on test: calls the set function on the deployed test contract (referenced as created{1512830015080}) with parameters 1 and 0xca35b7d915458ef540ade6068dfe2f44e8fa733c.

{
  "accounts": {
    "account{0}": "0xca35b7d915458ef540ade6068dfe2f44e8fa733c"
  },
  "linkReferences": {
    "testLib": "created{1512830014773}"
  },
  "transactions": [
    {
      "timestamp": 1512830014773,
      "record": {
        "value": "0",
        "parameters": [],
        "abi": "0xbc36789e7a1e281436464229828f817d6612f7b477d66591ff96a9e064bcc98a",
        "contractName": "testLib",
        "bytecode": "60606040523415600e57600080fd5b60968061001c6000396000f300606060405260043610603f576000357c0100000000000000000000000000000000000000000000000000000000900463ffffffff1680636d4ce63c146044575b600080fd5b604a6060565b6040518082815260200191505060405180910390f35b6000610d809050905600a165627a7a7230582022d123b15248b8176151f8d45c2dc132063bcc9bb8d5cd652aea7efae362c8050029",
        "linkReferences": {},
        "type": "constructor",
        "from": "account{0}"
      }
    },
    {
      "timestamp": 1512830015080,
      "record": {
        "value": "100",
        "parameters": [11],
        "abi": "0xc41589e7559804ea4a2080dad19d876a024ccb05117835447d72ce08c1d020ec",
        "contractName": "test",
        "bytecode": "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__browser/ballot.sol:testLib____________636d4ce63c6000604051602001526040518163ffffffff167c010000000000000000000000000000000000000000000000000000000002815260040160206040518083038186803b151561022e57600080fd5b6102c65a03f4151561023f57600080fd5b505050604051805190509050905600a165627a7a72305820e0b2510bb2890a0334bfe5613d96db3e72442e63b514cdeaee8fc2c6bbd19d3a0029",
        "linkReferences": {
          "browser/ballot.sol": {
            "testLib": [
              {
                "length": 20,
                "start": 511
              }
            ]
          }
        },
        "name": "",
        "type": "constructor",
        "from": "account{0}"
      }
    },
    {
      "timestamp": 1512830034180,
      "record": {
        "value": "1000000000000000000",
        "parameters": [1, "0xca35b7d915458ef540ade6068dfe2f44e8fa733c"],
        "to": "created{1512830015080}",
        "abi": "0xc41589e7559804ea4a2080dad19d876a024ccb05117835447d72ce08c1d020ec",
        "name": "set",
        "type": "function",
        "from": "account{0}"
      }
    }
  ],
  "abis": {
    "0xbc36789e7a1e281436464229828f817d6612f7b477d66591ff96a9e064bcc98a": [
      {
        "constant": true,
        "inputs": [],
        "name": "get",
        "outputs": [
          {
            "name": "",
            "type": "uint256"
          }
        ],
        "payable": false,
        "stateMutability": "view",
        "type": "function"
      }
    ],
    "0xc41589e7559804ea4a2080dad19d876a024ccb05117835447d72ce08c1d020ec": [
      {
        "constant": true,
        "inputs": [],
        "name": "getInt",
        "outputs": [
          {
            "name": "",
            "type": "uint256"
          }
        ],
        "payable": false,
        "stateMutability": "view",
        "type": "function"
      },
      {
        "constant": true,
        "inputs": [],
        "name": "getFromLib",
        "outputs": [
          {
            "name": "",
            "type": "uint256"
          }
        ],
        "payable": false,
        "stateMutability": "view",
        "type": "function"
      },
      {
        "constant": true,
        "inputs": [],
        "name": "getAddress",
        "outputs": [
          {
            "name": "",
            "type": "address"
          }
        ],
        "payable": false,
        "stateMutability": "view",
        "type": "function"
      },
      {
        "constant": false,
        "inputs": [
          {
            "name": "_t",
            "type": "uint256"
          },
          {
            "name": "_add",
            "type": "address"
          }
        ],
        "name": "set",
        "outputs": [],
        "payable": true,
        "stateMutability": "payable",
        "type": "function"
      },
      {
        "inputs": [
          {
            "name": "_r",
            "type": "uint256"
          }
        ],
        "payable": true,
        "stateMutability": "payable",
        "type": "constructor"
      }
    ]
  }
}