Débogueur
Le débogueur montre l’état du contrat lors de l’exécution d’une transaction.
It can be used on transactions created in Remix or by providing a transaction hash. The latter requires either that you have the contract’s source code compiled with the same settings as the deployed contract, or that the contract is verified on a block explorer.
Starting a Debugging Session
There are two ways to start a debugging session.
The first is to click the Debug button next to a transaction in the Terminal. The Debugger will be activated and will gain focus in the Side Panel.
The second is to use the Debugger directly. Activate the Debugger in the Plugin Manager and then click the bug icon in the Icon Panel. Input a transaction hash (you must also have the contract’s source code open in the editor), then click the button with the Play icon to start debugging.
The debugger will highlight the relevant code in the Editor. If you want to go back to editing the code without the Debugger’s highlights, then click the button with the Stop icon.
To learn more about how to use this tool, go to the Debugging Transactions page.
This page will go over the Debugger’s Use generated sources option, its navigation, and its panels.
Utiliser les sources générées
When Solidity compiles a contract, it generates internal Yul routines (such as ABI encoding/decoding and overflow checks) that are embedded in the bytecode but are not part of your source code. By default, the debugger has no source to map these opcodes to and skips over them.
When Use generated sources is enabled, these routines are surfaced in a separate .yul file in the editor. The debugger can then step through every opcode in the transaction without gaps, including the compiler-generated ones. This is particularly useful when auditing contracts, as it gives complete visibility into what is actually executing.
This option requires Solidity 0.7.2 or greater.
Les panneaux du débogueur
Transaction Details
The Transaction Details section is collapsible and appears at the top of the debugger panel. It shows metadata about the transaction being debugged, including:
Status: whether the transaction succeeded or was reverted
Block and Timestamp
From and To addresses
Function that was called
Value, Tx Fee, Gas Price, Gas Used, Tx Type, Tx Index, and Tx Nonce
Call Trace
The Call Trace shows the full call hierarchy of the transaction. The current step is shown in the header as Step: X / Y, where X is the current opcode step and Y is the total number of steps in the transaction.
Each entry in the trace shows the call type (e.g. SENDER or CALL), the address, and the function called. Each call entry also has three action icons that let you jump into the call, jump to its start, or jump to its end without stepping through every opcode manually.
State & Locals
The State & Locals tab displays a JSON object with two keys:
locals: the local variables in scope at the current execution stepstate: the state variables of the contract at the current execution step. Each variable is expanded to show itsvalue,type,length(for arrays),constant, andimmutableflags.
Each entry can be expanded or collapsed using the toggle next to it.
Stack & Memory
The Stack & Memory tab displays a single JSON object with four keys, each expandable:
opcode: the current opcode the debugger is on. Updates with each step.callStack: the call stack at the current step. It has a maximum size of 1024 elements and contains words of 256 bits.stack: the EVM operand stack at the current step. For more info about the stack.memory: the EVM memory at the current step. Memory is cleared for each new message call, is linear, and can be addressed at byte level. Reads are limited to a width of 256 bits while writes can be either 8 bits or 256 bits wide.
Execution Trace
The Execution Trace appears below the navigation buttons. Select a call from the Call Trace to load the step-by-step opcode trace for that call.
Informations complémentaires
The debugger is not only useful for fixing bugs. Its granular, step-by-step visibility into transaction execution makes it an excellent tool for understanding and auditing smart contracts.
To learn about using the debugger, go to Debugging Transactions.